Skip to content
IJAIST

IJAIST

  • Home
  • EDITORIAL BOARD
  • REVIEWER BOARD
  • PUBLICATIONS
    • 2012 ISSUES
    • 2013 ISSUES
    • 2014 ISSUES
    • 2015 ISSUES
    • 2016 ISSUES
    • 2017 ISSUES
    • 2018 ISSUES
    • 2019 ISSUES
    • 2020 ISSUES
    • 2021 ISSUES
    • 2023 ISSUES
  • For Authors
    • Format & Style
    • General instructions
    • References
    • Contributions
  • CALL FOR PAPERS
  • INDEXING
  • ONLINE SUBMISSION
  • CONTACT
2016 JANUARY ISSUE 

Handling Transition Product Backlog with Scrum off Scrum

August 13, 2018 Editor IJAIAT 0 Comments
Handlingtransitionproductbacklogwithscrumoffscrum

DOWNLOAD THIS PAPER HERE

File Description File size Downloads
pdf Handlingtransitionproductbacklogwithscrumoffscrum 350 KB 506
  • ← Rejection Analysis of a Nozzle Holder Manufacturing Unit using Root Cause Analysis Method
  • Enhanced production of cellulase free xylanase from UV irradiated improved strain of Bacillus altitudinis Kd1 (M) and its scale up in a stirred tank bioreactor →

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Copyright © 2023 IJAIST. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.